Heat

Pays on the degrees above 34.5 °C that pile up over seven days, not on a single hot afternoon.

Line drawing of a thermometer with its strike mark

Typical strike

18.4 °C-days

(01) The policy

Five numbers,
filled in for this peril.

The fifth number is your cell: we read it from the address you send, before the quote.

Index

Cumulative degrees above 34.5 °C of the daily maximum, summed over seven consecutive days

Typical strike

18.4 °C-days

Exit · pays 100 %

41.3 °C-days

Limit range

$90,000 – $9,800,000 per location

Tiers

Tier 1 · 18.4 °C-days · pays 25 % — Tier 2 · 27.9 °C-days · pays 50 % — Tier 3 · 41.3 °C-days · pays 100 % (daily maximum above 34.5 °C, summed over any 7 consecutive days)

(02) How it’s measured

Meridian Ground Network · Copernicus ERA5 reanalysis · NOAA satellite imagery

At least two of the sources must land within the policy margin before the calculation agent signs. If they don’t, the fallback order in your schedule decides.

(03) Who buys it

Vineyards and orchards, outdoor-work contractors, festivals, energy retailers exposed to cooling demand, construction firms

Aerial view along the roofs of a long agricultural greenhouse complex under a hazy white sky, with a small weather station between two buildings.

(04) The policy in full

One hot afternoon rarely breaks a business. A week of them does: crews stop at noon, grapes burn, cooling systems run flat out and bills double. The Heat policy therefore counts degrees over a week. Each day, take the highest temperature of the day, subtract 34.5 °C, and keep the result if it is positive. Add up any seven consecutive days. That sum is the index.

Tier 1 starts at 18.4 °C-days and pays 25 % of the limit; for example, seven days at a maximum of 37.1 °C gives 18.2, just under, and a single extra degree on one of them crosses it. Tier 2 starts at 27.9 °C-days and pays 50 %. Tier 3 starts at 41.3 °C-days and pays the full limit. The window rolls day by day, so the worst week counts, not a calendar week.

Temperatures come from the station nearest your site, checked against reanalysis and a satellite surface-temperature estimate. Stations near buildings read warm, and a shaded sensor reads cool, so the policy lists the station by identifier and keeps it for the whole policy period. The calculation agent signs only when the station and reanalysis stay within 1.2 °C of each other over the week.

Prevention for heat arrives early because heat waves are well forecast. The alert goes out when a seven-day forecast gives your cell more than a one-in-three chance of crossing Tier 1, with the forecast daily maxima laid out day by day. For outdoor employers, it comes with a summary of the shift patterns that other insured sites switched to in similar weeks. The policy does not pay less if you take them.

(05) Coverages

Stack a second peril
on the same site.

Wind

Highest 10-minute mean wind speed at 10 m, read per 10 × 10 km cell

Typical strike

150 km/h

$250,000 – $38,000,000 per location

→

Wind

Highest 10-minute mean wind speed at 10 m, read per 10 × 10 km cell

Typical strike

150 km/h

$250,000 – $38,000,000 per location

Rainfall

Accumulated rainfall in the cell over a rolling 6-hour or 24-hour window, whichever pays more

Typical strike

43 mm in 6 h (or 78 mm in 24 h)

$120,000 – $14,500,000 per location

→

Rainfall

Accumulated rainfall in the cell over a rolling 6-hour or 24-hour window, whichever pays more

Typical strike

43 mm in 6 h (or 78 mm in 24 h)

$120,000 – $14,500,000 per location

Earthquake

Moment magnitude of an event with its epicentre inside the insured radius and a depth shallower than 70 km

Typical strike

Mw 5.8 within 41 km

$500,000 – $65,000,000 per location

→

Earthquake

Moment magnitude of an event with its epicentre inside the insured radius and a depth shallower than 70 km

Typical strike

Mw 5.8 within 41 km

$500,000 – $65,000,000 per location

Flight delay

Minutes between scheduled and actual gate arrival of a named flight, read from the aviation feed

Typical strike

187 minutes

$400 – $12,600 per traveller, up to $1,350,000 per group

→

Flight delay

Minutes between scheduled and actual gate arrival of a named flight, read from the aviation feed

Typical strike

187 minutes

$400 – $12,600 per traveller, up to $1,350,000 per group

Flood level

River stage in centimetres above the gauge's warning level, highest hourly reading in the event

Typical strike

118 cm

$180,000 – $22,000,000 per location

→

Flood level

River stage in centimetres above the gauge's warning level, highest hourly reading in the event

Typical strike

118 cm

$180,000 – $22,000,000 per location

Next step

Want this on your site?
Send us the address.

Create a free website with Framer, the website builder loved by startups, designers and agencies.