/

Earthquake

Earthquake

Pays on the magnitude of a shallow quake inside a fixed radius around your site, read from two independent networks.

Line drawing of a seismograph trace crossing its strike line

Typical strike

Mw 5.8 within 41 km

(01) The policy

Five numbers,
filled in for this peril.

The fifth number is your cell: we read it from the address you send, before the quote.

Index

Moment magnitude of an event with its epicentre inside the insured radius and a depth shallower than 70 km

Typical strike

Mw 5.8 within 41 km

Exit · pays 100 %

Mw 7.1 within 41 km

Limit range

$500,000 – $65,000,000 per location

Tiers

Tier 1 · Mw 5.8 · pays 25 % — Tier 2 · Mw 6.4 · pays 50 % — Tier 3 · Mw 7.1 · pays 100 % (all within 41 km of the insured location, depth under 70 km)

(02) How it’s measured

USGS earthquake catalogue · Ostrander Seismic Array

At least two of the sources must land within the policy margin before the calculation agent signs. If they don’t, the fallback order in your schedule decides.

(03) Who buys it

Manufacturers with a single plant, data-centre operators, ports, hospitality groups on the Pacific Rim, lenders with concentrated collateral

A small accelerometer bolted to a concrete wall in a building's basement plant room, an orange hard hat hanging on a hook beside the open cabinet.

(04) The policy in full

An earthquake policy has the simplest index of the six and the hardest conversation about distance. We draw a circle around the insured location, 41 kilometres by default, and the policy answers one question: did a shallow event of at least a given magnitude start inside it? Magnitude is moment magnitude, the number agencies publish after the first hours of analysis, not the first automatic estimate that is often revised.

The three tiers are Mw 5.8 (25 % of the limit), Mw 6.4 (50 %) and Mw 7.1 (the full limit). The depth rule, shallower than 70 kilometres, keeps deep events that shake broadly and weakly out of the index. If a quake falls in between, say Mw 6.2, you receive the tier below it and the settlement note shows the next one so the ladder stays readable.

Two networks have to agree. The calculation agent takes the magnitude from the public catalogue and from a second regional array, and signs when they are within 0.3 of each other. When they are not, the policy waits for the catalogue’s reviewed solution and pays on that, usually within a few hours. A later revision of the magnitude does not reverse a payment that was made on a reviewed value.

Prevention for earthquakes is mostly about the first minutes, so the policy sends an early notice when a regional network publishes a shaking forecast for your cell, and keeps a checklist for the hours after: gas valves, rack power, evacuation counts. It cannot predict a quake. It can shorten the time between the shaking and the first person who knows about it.

(05) Coverages

Stack a second peril
on the same site.

Wind

Highest 10-minute mean wind speed at 10 m, read per 10 × 10 km cell

Typical strike

150 km/h

$250,000 – $38,000,000 per location

→

Wind

Highest 10-minute mean wind speed at 10 m, read per 10 × 10 km cell

Typical strike

150 km/h

$250,000 – $38,000,000 per location

Rainfall

Accumulated rainfall in the cell over a rolling 6-hour or 24-hour window, whichever pays more

Typical strike

43 mm in 6 h (or 78 mm in 24 h)

$120,000 – $14,500,000 per location

→

Rainfall

Accumulated rainfall in the cell over a rolling 6-hour or 24-hour window, whichever pays more

Typical strike

43 mm in 6 h (or 78 mm in 24 h)

$120,000 – $14,500,000 per location

Flight delay

Minutes between scheduled and actual gate arrival of a named flight, read from the aviation feed

Typical strike

187 minutes

$400 – $12,600 per traveller, up to $1,350,000 per group

→

Flight delay

Minutes between scheduled and actual gate arrival of a named flight, read from the aviation feed

Typical strike

187 minutes

$400 – $12,600 per traveller, up to $1,350,000 per group

Flood level

River stage in centimetres above the gauge's warning level, highest hourly reading in the event

Typical strike

118 cm

$180,000 – $22,000,000 per location

→

Flood level

River stage in centimetres above the gauge's warning level, highest hourly reading in the event

Typical strike

118 cm

$180,000 – $22,000,000 per location

Heat

Cumulative degrees above 34.5 °C of the daily maximum, summed over seven consecutive days

Typical strike

18.4 °C-days

$90,000 – $9,800,000 per location

→

Heat

Cumulative degrees above 34.5 °C of the daily maximum, summed over seven consecutive days

Typical strike

18.4 °C-days

$90,000 – $9,800,000 per location

Next step

Want this on your site?
Send us the address.

Create a free website with Framer, the website builder loved by startups, designers and agencies.